Where Does a New Septic Tank Fit Into the Home Building Process in the Bedford, NY, Area?

Where Does a New Septic Tank Fit Into the Home Building Process in the Bedford, NY, Area?

A series of steps need to be taken to have a new septic tank installed at a new construction home in the Bedford, NY, area. Typically, this process begins before the ground is even broken. It’s best to contact a septic system contractor early on in the process to ensure everything will be done correctly.

Related: Tips To Avoid Needing A New Septic Tank This Year In Chappaqua And Pleasantville, NY

Planning for a Septic System

Generally, the septic system placement needs to be approved as part of a home construction permit, but it isn’t actually installed until after the home is built. One of the first things that will need to be done is to identify the location where the septic system will be installed. When you hire an experienced septic system installation company early on in the process, they will be able to take care of all of the planning for you.

Selecting Your System

With the guidance of your new septic tank installer, you will need to decide which size of septic tank you’ll need for your new home. The size needed depends on the amount of water your family will use each day. A septic tank professional can make recommendations based on average use statistics. You can choose either a pressure-type septic system or a gravity system, depending on your unique property. You will also have the choice of septic system tank types, including concrete, plastic, and fiberglass.

Determining the Location

It is important that a septic system is installed correctly and in an ideal location, not only because you will want it to work properly but because you don’t want to end up being fined by local authorities for not abiding by code requirements.

The slope of the land is considered when determining where your septic system will be located. Generally, it will be located on level ground. It will need to be installed in a location away from areas that may flood or areas with dense tree roots. Typically a septic system shouldn’t be installed close to the home foundation.

Home Permit Requirements

Part of the permit process will involve soil testing, often called perc tests. The soil quality is important because it will act as a filter, so it needs to be permeable and able to absorb liquid. Once your contractors have secured a permit, home construction can begin, and that is followed by the septic system installation.

Excavation

When it’s time to have the septic system installed, excavation of the site will begin if it hasn’t already. The base will need to be level, and the hole will need to be deep enough and wide enough for the tank to fit. Professionals are equipped with the proper machines and tools needed to get the job done right.

Inspection

Once your septic system is fully installed, it will need to be inspected. Local authorities will make sure it is running correctly and that it has been installed to code. They’ll ensure there are no leaks, operating issues, or drainage problems.

After the initial inspection, inspections generally need to occur every three to five years to ensure everything is operating smoothly. This is essential as leaks out of a septic tank can cause environmental harm and be detrimental to health.

Related: 4 Ideas For Keeping The Area Around Your New Septic Tank Clear Yet Decorative In Briarcliff Manor And Tarrytown, NY