A Look at Timelines: Septic Tank Installation vs. Septic System Repair in the Briarcliff Manor, NY, Area

If you have a septic tank on your Briarcliff Manor, NY, area property, there may come a time when you have to get repair or replacement services completed. If you have to decide between repair or replacement should something go wrong with your septic system, it’s important to look at the pros and cons of each option. For example, the timelines of septic tank installation and septic system repair can be very different. Here’s some information on the timelines associated with each septic system service:

Related: Septic Tank Repair Vs. Sewer Repair In The Chappaqua, NY, Area

Septic Tank Installation Timeline

If you must have a new septic tank installed, it may only take a week or two to complete this project. However, if your property needs a complete septic system installation, the timeline increases to approximately four to six weeks. When you have a septic tank installed, the septic system installation company has to take a variety of steps to get the job done. Here are some common steps with a new septic system installation:

  • Choose the right septic system: Septic tank systems come in various sizes and styles. Your septic tank installation experts will help you consider factors such as wastewater output, material, and compliance requirements to choose the right one for your home.

  • Obtain permits for the installation: Any required permits may need to be a joint effort between you and your service provider.

  • Survey the property: Your property may need to be surveyed, to ensure your septic tank will be installed only on your property and not someone else’s.

  • Prepare the septic system space: Your septic system contractor may need to excavate and prepare the space for the new septic system. 

  • Install the septic tank: The next step is the septic tank installation.

  • Test the septic system: Once the septic tank is installed, the septic system contractor will test the system to ensure everything works right, and a maintenance schedule can be discussed. 

For properties that only need a septic tank replacement, not a complete septic system installation, the process tends to be easier as the trench is already dug and the main part of the process only involves replacing the old tank with the new one.  

Septic System Repair Timeline

If you need a septic system repair as opposed to a new septic system installation, this process may be a bit more time friendly. Depending on the repair needs, the process from start to finish may only take a few hours to a few days, depending on the extent of the repairs needed. Once your septic system contractor evaluates the system and determines what the problem is, they’ll likely be able to offer a solution. 

Is Replacement or Repair Better?

When deciding if replacement or repair is a better option, look at the extent of the issue. You could ask your septic system contractor if they recommend a repair or replacement for your septic system. If repair is an option, inquire about whether this would be a good solution or if a total replacement is a better choice. If you can have your septic system repaired rather than replaced, you can likely get your septic tank running more quickly than if a total replacement of the septic system was necessary. However, sometimes a septic system replacement is vital.

Related: Is A Septic Repair In Your Near Future? Here’s How To Tell In The Bedford, NY, Area